Summary of main actions |
| |
|
 |
| |
|
| Action/Operation |
Overall Target |
Progress to 30/6/06 |
C1-Fell to Waste
C1-Fell/Windrow |
312.6 (ha)
549.4 (ha) |
76.65 (ha)
318.35 (ha) |
| C2-Fell and Chip |
10.17 (ha) |
8.17 (ha) |
| C3-Commercial Felling |
110.1* (ha) |
107.5 (ha) |
| C4-Install Dams |
1556.7 (ha) |
696.1 (ha) |
| C5-Erect/Repair Fences |
555.4 (ha) |
586.4 (ha) |
C6-Build/Repair Roads
including Carparks |
7360 (m) |
4860 (m)
and 4 Car Parks |
| C7-Install Dipwells |
As required |
98 (no) |
| D1-Remove Natural Regeneration |
252 (ha) |
339.5 (ha) |
|
| |
|
| |
|
|